The largest specialty complex. Extrusion and printing Types of warning tapes in the Middle East
Baran Plastic Manufacturing (RPM) is a pioneer in the sub-surface safety supply chain, authorized and approved by the Ministry of Petroleum, National Iranian Gas Company, Gator, National Iranian Water and Sewerage Engineering Company and Telecommunications Company. We are committed to the maintenance of vital arteries of national projects.

Continuous production of a variety of gas, electricity, water and telecommunications warning rolls
Structural achievements of Baran Plast factories
Continued sustainable cooperation with more than 600 contractors and infrastructure bodies in the country
Extrusion of light and heavy polymers with micron-thickness control standards
Global gas transmission lines, fiber optic networks, dams and infrastructure tunnels
Continuous provision of a dual-threat zone for projects in Iraq, Afghanistan, Armenia and the Persian Gulf region
From the primary workshop to the industrial extrusion pole and polyethylene printing.
Baran Plastic Production Industries began its operations in 1367 to the attention of the Brahmin engineer and aimed to respond to the growing demand of Iran's infrastructure development sector in the decade of reconstruction. Initially, the production unit focused on the initial processing of lightweight polyethylene films (LDPE).
With the expansion of global gas grids and high-pressure electricity, Plastic Rain shifted its lines to the fully centralized design and manufacture of specialized underground warning and hazard alarms. The plant's relocation to Tehran's Feroz-Baram district, the deployment of Flexo printing technologies and the installation of a material resistance laboratory, made the set a reference to the demands of the parent contractors.

Specialized machinery and production facilities based in Ferozebharam
A combination of multilayer film extraction lines, precise flexographic printing and digital quality assurance systems
Extrusion lines of PE film
Advanced extrusion devices with the ability to simultaneously form HDPE and petrochemical LDPE granules. It allows film production from 40 to 300 microns thick with complete homogeneity throughout the roll length.
Flexographic printing of 2 to 6 colors
Rotary printing machines use digital gelatinous clips, durable printing of readers fonts, and enter the official symbols of engineering standards without diffusion of the underlying elements of rain and soil.
Automatic screw roll with optical controller
Accurate rolling equipment with automatic counting metering sensors for 150-, 200- and 250-metre rolls without error or breakage of metering; single-handed assembly and vacuum packing of pallets.
Quality control and stretch testing lab.
The ASTM D882 stretch-to-breaking length test, the measurement of the amount of corrosion and the accelerated thermal corrosion test, as required by the gas company inspection.
Laminate unit of detectable tape.
Install an aluminum or steel strip thermal bond between the polymer layers of the warning film to prevent oxidation of the film and to allow tracking with surface plumbing devices.
A 60-tonne bascule and a transit warehouse.
The digital bus station is located on the factory premises with trailers and transit trucks capable of rapidly discharging cargo and direct loading to the entire country and export borders.
Approved by government agencies and supervisory bodies
Message from the chief executive of Baran Plastic Factories.
Brahmin engineer • Founder and CEO
The safety of national capital and manpower based on lifetime projects is unacceptable. A non-standard hazard strip that gets powdered or stained after a year creates a deadly trap for drilling machines. We have stood for 35 years in Plastic Rain on the quality of polymer films, the stability of melted paint and the standard thickness. Our commitment is to deliver the product directly from the factory to the project at no broker's fee. ⁇
Do you need to order a warning tape or a special print?
The Plastic Rain Sales Engineering team is ready to present an official pre-factory, send a free sample to the project workshop, and arrange a production contract to guarantee a precise loading timing.